mtanyctransit on Instagram

MTA New York City Transit

Official Instagram for MTA New York City Transit. For 24/7 travel info, visit www.mta.info or call 511 and say "MTA" and then "Subways and Buses."

http://web.mta.info/coldWeather/ Similar users

Report inappropriate content

An S74 bus moves through Richmondtown, Staten Island during tonight's snowfall. Click on the link in our bio for the MTA Winter Weather Travel Guide. (Photo: M. Hermann / MTA NYCT.) at Historic Richmond Town

6

Crews were out performing FASTRACK work on the 1/2/3 lines in Manhattan during overnights this week. Track, signal, structural and other components of the system were inspected, maintained and repaired as-needed. (Photos: M. Hermann / MTA NYCT.)

15

Have you seen our new R211 subway car prototypes? Check them out now through December 6 in the mezzanine of the 34 St-Hudson Yards station on the 7 line! We want to hear from you, too; be sure to give your feedback to MTA staff at the exhibit, through Twitter @NYCTSubway, Facebook or through the website linked in our profile. (Photos: M. Hermann / MTA NYCT.)

105

As we commemorate Veterans Day, we also pay tribute to the MTA's own who served. Among them is Walter Reed, who celebrated his 98th birthday this week. Mr. Reed joined the army in 1941, and later operated work trains for NYC Transit until his retirement in 1977. (Photo: M. Hermann / MTA NYCT.)

8

Prospect Av R Station is now open! As part of our Enhanced Station Initiative, Prospect Av was renovated using improved station design standards. The newly reimagined station features upgrades like countdown clocks at station entrances, enhanced lighting, and beautiful artwork. (Photos: M. Hermann / MTA NYCT.)

50

As the region deals with heavy rain and high wind tonight, our crews have been busy removing tree branches and debris that have fallen to the roadbed along our open-air lines, like here at 18th Av on the Sea Beach N line. As always, visit mta.info or monitor @NYCTSubway on Twitter for service updates. (Photos: M. Hermann / MTA NYCT.)

4

Our crews wrapped up a second week of overnight FASTRACK work on the 1/2/3 lines between Nevins St and 34 St-Penn Station early this morning. The next two weeks of FASTRACK will bring an intensive round of maintenance to the N/Q/R/W lines in Manhattan, starting November 6. Visit mta.info for more information about the FASTRACK program. (Photos: M. Hermann / MTA NYCT.)

15

The Bay Ridge Av station is back open and looks better than ever! This afternoon, we reopened the reimagined Bay Ridge Av station on the R line in Brooklyn. Since April, we’ve given the station a complete facelift, including installation of new lighting, platform surfaces, digital signage, and artwork. This is the second station to be redesigned under the Enhanced Station Initiative (ESI.) (Photos: M. Hermann / MTA NYCT.)

14
<

Some of our subway cars are getting a new look! As part of a pilot program under MTA Chairman Joseph Lhota’s Subway Action Plan, 100 of our “R-160” cars are being redesigned, to include increased capacity, as well as mechanical and cosmetic improvements. These cars started running on the E line this week. Click on the link in our profile for more information! (Photos: M. Hermann / MTA NYCT.)

57

MTA New York City Transit employees took part in a Hands-Only CPR training program, sponsored by the American Heart Association, at the New York Transit Museum today. Our own David Martinez, a Signal Maintainer who saved the life of a coworker last year, was also on hand. To learn more, visit heart.org/handsonlycpr #CPRSavesLives @nytransitmuseum @american_heart (Photos: M. Hermann / MTA NYCT.) at New York Transit Museum

16

Today, we reopened the reimagined 53 Street R Station in Sunset Park, Brooklyn. This is the first of 33 stations to undergo extensive renovations as part of Governor Cuomo’s initiative to create new and improved design standards for subway stations. In addition to enhanced lighting, countdown clocks, WiFi connectivity, and USB charging ports, new tile mosaics from artist Mickalene Thomas accent the station. @mtaartsdesign (Photos: M. Hermann / MTA NYCT.)

24

This weekend the Bx6 became our 15th Select Bus Service route. With features like dedicated bus lanes and off-board fare payment, Select Bus Service brings faster and more reliable service to the Bx6. In addition to features that help make your Bx6 faster and more reliable, Bx6 buses got a new look. Find out more about the new Bx6 Select Bus Service by clicking the link in our profile. (Photos: M. Hermann / MTA NYCT.)

14

NYPD Transit District 34 at Stillwell Terminal was just one of the commands taking part in National Night Out Against Crime. Now in its 34th year, the annual event gives the police and the community a chance to mingle–and enjoy food and fun! (Photos: M. Hermann / MTA NYCT.) #nationalnightout2017 at Coney Island–Stillwell Avenue

14

Due to a fire in an apartment building on East 9th St. and Broadway, R & W trains are bypassing 8 St in both directions. The station filled with smoke, and the street level entrances were made hazardous by falling glass and debris. Monitor mta.info or @NYCTSubway on Twitter for service updates. (Photos: M. Hermann / MTA NYCT.)

31

Our neighbor at the West 8 St-NY Aquarium station turns 90 today—the Coney Island Cyclone! Happy Birthday, from our tracks to yours! (Photo: M. Hermann / MTA NYCT.)

18

Congratulations to the more than 130 seniors who graduated from Transit Tech High School today! Acting MTA New York City Transit President Darryl Irick delivered the keynote address to the Class of 2017 from Transit Tech, a Career and Technical Education (CTE) school that prepares students for professions in the rapid transit industry. (Photos: M. Hermann / MTA NYCT.)

5

Crew removes and replaces a section of third rail south of 157 St this week as part of FASTRACK work on the 1 line. Follow the link in our profile for a full recap of what we accomplished during the first of two weeks of overnight work on the section of the line between 96 St and Dyckman St. (Photos: M. Hermann / MTA NYCT.)

6

Our crews were out on the G line between Court Sq and Bedford-Nostrand Avs overnight this week performing FASTRACK work. Follow the link in our profile for a recap of what was accomplished. We'll be back out there again next week to make additional repairs and inspections. (Photo: M. Hermann / MTA NYCT.)

26
Next »